Fire strategy in Twickenham buildings
Send the details of your conversion or change of use to get a clear idea of what the specialist firm will produce. There is no fee for the initial conversation, so you know where you stand before committing.
What is produced
Parts of a fire strategy report in Twickenham
- Escape route design
- The specialist maps every travel distance and stair width to confirm the proposed layout meets Part B requirements for safe evacuation.
- Compartmentation plan
- Drawings show where fire-resisting walls and floors must be built. The specialist firm specifies materials and sealing methods for each barrier.
- Evacuation approach
- A written procedure explains whether occupants stay put or leave together. This aligns with the fire evacuation plans required for the finished home.
When building control asks for a strategy
Converting a shop on Heath Road into flats requires a written document showing how residents escape. Building control expects this submission before they review the structural drawings.
Changing an office into residential space alters who occupies the rooms and how fast they move. A fire strategy change of use addresses these differences directly.
Architects need drawings they can work from immediately. The specialist produces floor plans marking exit routes, door ratings and compartment lines that slot straight into the wider design.
Documents you receive after the assessment
The specialist firm examines the proposed floor plans and writes a record of their professional judgement. You receive documents that satisfy building control and guide the construction work.

- Written strategy document
- A detailed report covering means of escape, fire spread prevention and access for firefighters, formatted for the building control submission.
- Annotated floor plans
- Drawings marked up with travel distances, door widths and compartment boundaries that your architect can reference during detailed design.
- Specification notes
- Product types and fire ratings for doors, walls and seals so builders purchase the correct materials on site.
Questions about commissioning a strategy
Does building control need a strategy before we submit?
Yes. For a shop conversion into flats on Heath Road, building control requires the written strategy alongside your application. They check it against Approved Document B before approving the plans.
What drawings come with the strategy?
The specialist provides annotated floor plans showing escape routes, travel distances and compartment lines. Your architect can work directly from these drawings, which match the format used by fire engineers across Richmond.
How long does a small conversion take?
A straightforward conversion usually takes one to two weeks once the specialist has the existing and proposed floor plans. Complex layouts or multiple changes of use take longer.
Can you write a strategy for office to residential?
Yes. Changing an office into homes requires a specific fire strategy change of use. The specialist addresses the different occupancy patterns, alarm systems and escape speeds involved.
What if building control query the escape routes?
The specialist reviews any queries from building control and revises the document where needed. This back-and-forth is normal and continues until the inspector accepts the arrangement.
Do we need the strategy before structural drawings?
Yes. The specialist should produce the fire strategy before structural drawings are finalised. This means the architect designs the layout around confirmed escape widths, travel distances and compartment walls from the start, avoiding costly revisions to the structure later in the project.
Will it cover stair width and travel distances?
Yes. Every proposed layout is measured against Part B limits. The report states the exact travel distances and confirms whether each stair width is sufficient.
Steps to getting a strategy written
- 1
Send the plans
You provide existing and proposed floor plans along with the intended use of each room to start the process.
- 2
Specialist review
The specialist firm measures travel distances, checks stair widths and identifies where new compartment walls are needed.
- 3
Draft issued
You receive a draft strategy document and annotated drawings to share with your architect and building control officer.
- 4
Final submission
After any revisions, the specialist issues the final report ready for inclusion in your building control application.
Areas covered around Twickenham
The specialist firms taking enquiries through this site work across Twickenham and the surrounding west London towns. Each area has its own building stock, from Victorian terraces to post-war conversions.
If your town is not listed, send an enquiry to check availability.
Get a fire strategy for your project
Describe your conversion or change of use and the specialist firm will outline what the report involves. Sending an enquiry does not commit you to any work or payment.